INSTRUCTIONS
Conbox Instructions
ConBox assembly video
Air conditioner cover. About 10 minutes with two people and a drill with a Phillips bit.
Download the ConBox data sheet (PDF)BatBox assembly video
Solar battery cover. About 10 to 15 minutes with two people. The Large arrives pre-hinged; the Extra Large bolts together with 3 hinges.
Download the BatBox data sheet (PDF)Stacking two ConBoxes
Need more height? Build the top ConBox as normal. Build the bottom one without its top panel and fit its 6 feet. With a second person, lift the top ConBox onto the bottom one, line up the holes and bolt them together from underneath with the spare M8 bolts supplied in the box.
Wall mounting
Every ConBox and BatBox has 4 keyhole slots for fixing it to a wall, one near the top and one near the bottom of each edge flange. Hang it on screws through the slots, using fixings to suit your wall. The data sheets include a wall mounting sketch.
BatBox battery safety
The BatBox is a cover only. Never open, unplug or move the battery or inverter. Check with your battery installer that the battery can be enclosed, and that clearances, ventilation, safety signs and the isolator switch stay accessible (for example under AS/NZS 5139 and the battery manufacturer's instructions).
The Conbox is easily assembled from its flat-pack. All you will need is a handheld power drill with a Phillips Head drill bit.
The Conbox package contains:
- 1x louvred top panel and 1x pre-hinged three-panel wall (front and two sides), powder-coated aluminium
- 4x steel self-tapping button-head screws (Phillips head)
- 6x adjustable feet: plastic base with M8 bolt (20 to 40 mm), two each side and two at the front
- Spare M8 bolts (for stacking)
![]() |
Your Conbox will arrive in a flat pack box. In order to complete assembly you will require a handheld drill, with a Phillips Head attachment. |
![]() |
Open the cardboard box and remove the top panel and the three panelled wall piece. Place the top panel on the top of the three panelled wall piece. Ensure that the box is the right way up (the logo should be at the top). |
![]() |
There are two holes along the two short edges of the top panel. Use your handheld power drill and drill the 4x Phillips Head self tapping screws through the top panel into the sides. Hold your Conbox in assembled position while drilling. |
![]() |
You may need a second person to help carefully sit the Conbox on its side. Screw the 6 adjustable feet into the pre-cut holes on the bottom: two each side and two at the front. Once the Conbox is in position, the feet can be adjusted to accommodate for uneven surfaces. |
![]() |
Go to your currently unsightly outdoor unit. |
![]() |
Push the Conbox over the unit and adjust the feet if the surface is uneven. The feet can be adjusted by screwing on to decrease the height or vice versa. Admire your now beautifully covered outdoor unit, and enjoy your comfortable conditioned air. |





